Reno-Market
The installation of a new storm sewer trunk line ranging in size from 24-48” in diameter, new and additional catch basins, and a new outfall at a cost of $800,000.
The old storm infrastructure in the area consisted of curb and gutter, with limited catch basins on Reno Ave and no catch basins on Market St. The old system was undersized which lead to frequent street and yard flooding. The new storm sewer infrastructure will reduce flows being conveyed down Reno Avenue that has caused chronic flooding at Reno and Silver intersection. The new storm system on Market St will eliminate street flooding as previously there was no storm system on Market. New catch basins on Spring Avenue along with a grate drain across Spring Avenue at the intersection of Spring Street will improve collection of storm water and reduce flooding at this intersection.